Nairn Spillway

Client

EBC

Year of Completion

2022

Steel Volume

250 tons

Contract Value

$3 million

image

Essential Steel Components Supporting the Nairn Spillway Project in Ontario

Metotech played a key role in the Nairn Spillway Upstream Cofferdam project in Ontario, led by EBC. We designed and manufactured a 750-ton temporary steel bridge, a critical structure that ensured reliable access to the construction site throughout the project.

image
Manufacture of main beams.
image
Pre-assembly at the factory prior to delivery.

Nature of the work performed

Metotech undertook the design, production, and delivery of a 750-ton temporary steel bridge. This critical structure was manufactured with exceptional precision, ensuring seamless and immediate on-site assembly with no adjustments required.
image
Temporary bridge

Technical challenges

This project was characterized by exceptionally tight fabrication schedules. It required precise planning and close coordination with the client to ensure that every component was ready for installation exactly when needed.

Metotech expertise

Through fast, precise production and rigorous quality control, Metotech delivered structures engineered to the project’s specifications. This reliability enabled flawless installation and strengthened client trust through constant, proactive communication.

Certifications & Quality Control


Precision
through
process

learn more
image
image
image

No Project Beyond Our Expertise

Contact Us!

contact us
Any trouble?